Entry 21 : Final improvemnets
ENTRY #21
Between the days of the last entry and now I have taken into consideration by Mr.Bansee and Dr.Kuldpee to improve the safety and to standardize parts to lessen the manufacturing process time,
I accomplished this by first implementing a kill switch system. This will allow a singular participant to cut all power if necessary to the entire unit.
In standardizing the parts used for the machine, components such as the drill system, castor wheels, and pulleys along with the v-belts were all standardized making it available for purchase whether online or from a local commercial business.
After completion of these additions and replacements, drawings were then complied and handed in to my supervisor where a short meeting was held where I was told to re-draw small details and to add exploded views.
Another meeting was scheduled for the 25th of January at 8:00 pm