Entry 27 : Continuation of Build and Start of Calculations
ENTRY #27
As of today the deadline for my model presentation has been set for April the 6th 2022. If I am kept on schedule I would have no problem with making this deadline however a hiccup in my building experience has occurred as my technician Imran Mohammed has called sic with covid and would be out of commission for 2 weeks. However, I have still been trying to build my project and recently installed the 4 castor wheels needed to make my design portable.
The image below shows the completed frame.
In site of working on my physical model I have also began the calculations phase of my fyp and soon would assign a meeting with my supervisor to discuss these calculations